Study Guide

Type 2 Electrician: Written + Practical Study Guide

A focused preparation guide for the Japanese Second-Class Electrician examination. It separates the written knowledge test from the practical build, teaches recurring mechanisms with original worked examples, and supplies a 20-question supporting-knowledge preview plus an open-task self-check.

Updated October 202613 min readStudy GuideDenken Exam
Claire Brooks

Claire Brooks

Denken Exam Editorial Team

Scope: this covers Japan's Second-Class Electrician national examination for work on general-use electrical installations (一般用電気工作物). The written component is four-choice and may be taken on paper or by CBT, covering electrical theory, distribution and wiring design, equipment and materials, construction methods, inspection, wiring diagrams, and safety law. The practical component is a timed build from a given wiring diagram using materials provided at the test site and your own tools, judged for defects. Official materials state a written pass mark of 60 and a practical standard of no defects, but check the current official candidate guide for dates, fees, venues, exemptions, and other administrative details — and note that this is subject review, not a practical-exam simulation. Short answer: prepare for two linked but different assessments—a four-choice written test of electrical knowledge and diagram interpretation, and a practical build judged for defects. The 20 MCQs below are a preview that checks supporting knowledge only; they are not full syllabus coverage and are not a simulation of either the full written examination or the practical examination.

Scope, components, and what is assessed

The credential has a written knowledge gate and a separate practical build; study them differently. The Type 2 scope is work on general-use electrical installations (一般用電気工作物), not all electrical work.

The examination covers the knowledge and skills needed for safety of general-use electrical installations (一般用電気工作物) in Japan. The written test uses four-choice questions and can be taken on paper or by CBT; the official guide states that question format and difficulty are unchanged between those delivery modes. Its subject areas include basic electrical theory, distribution and wiring design, equipment, materials and tools, construction methods, inspection methods, wiring diagrams, and safety law. The practical test is open to those who pass the written test or hold an approved exemption. You use materials provided at the test site and your own tools to complete a problem given as a wiring diagram within the set time.

The practical examination is not a written quiz. Expect it to assess connections, wiring work, installation of equipment and wiring devices, use of materials and tools, attachment of cords and cabtyre cables, grounding work, measurement of current, voltage, power and resistance, inspection, and repair of fault locations. Official materials state that the written pass mark is 60 and the practical standard is that the work has no defects. Check administrative rules, exemptions, dates and fees against the current official candidate guide rather than inferring them from this preview.

Preparation priorities

Spend most time on recurring calculations, diagram behavior, instrument logic, and safety judgment.

First priority is calculation fluency: Ohm's law, series and parallel resistance, current division, power, energy, RMS values, and power factor. These ideas reappear in equipment, inspection and practical reasoning. Second priority is control and sequence diagrams: normally open and normally closed contacts, self-holding, stop circuits, overload contacts, and interlocks. Third is inspection and measurement: choosing the right instrument, preparing an isolated circuit, and interpreting a reading in context. Fourth is safety and protective judgment: isolation, hazard recognition, and coordinated selection of conductors and protective devices.

Use three passes. Pass one builds closed-book concept maps and symbol recognition. Pass two solves worked problems and traces diagrams aloud. Pass three uses mixed timed sets and an error log. Record why each error happened—unit conversion, formula choice, contact state, instrument choice, or unsafe assumption—so revision targets the cause rather than the topic label. For practical work, use supervised laboratory practice or paper-based connection schedules; do not treat reading about wiring as hands-on competence.

Circuit calculations with a worked scenario

Draw the equivalent circuit, compute total resistance, then apply Ohm's law and voltage or current division.

A 12 V source feeds a 6 Ω resistor in series with a parallel pair of 12 Ω and 24 Ω. The parallel equivalent is (12 × 24) ÷ (12 + 24) = 288 ÷ 36 = 8 Ω. Total resistance is 6 + 8 = 14 Ω. Source current is 12 ÷ 14 = 0.857 A. The parallel section voltage is 0.857 × 8 = 6.86 V. Branch currents are 6.86 ÷ 12 = 0.571 A and 6.86 ÷ 24 = 0.286 A, which add to 0.857 A. Check the series voltage: 0.857 × 6 = 5.14 V, and 5.14 + 6.86 = 12 V.

For parallel resistances, do not add them directly. For two resistors use the product over sum, or convert each to a conductance and add. For series circuits, current is common and voltage divides; for parallel circuits, voltage is common and current divides. Keep units visible: Ω, V, A, W, kWh. A useful check is to compute power from both V × I and I²R and see whether they agree.

AC values, power, and power factor

Separate peak from RMS, and separate apparent, active, and reactive power.

For a sine wave, RMS value is peak ÷ √2. A 100 V peak therefore corresponds to about 70.7 V RMS. Frequency is a separate property and does not change the amplitude relationship. In a simple resistive circuit, voltage and current are in phase, so power factor is 1. In a circuit with reactance, apparent power S = VI is larger than active power P = VI cos θ.

Worked example: a single-phase load takes 10 A at 200 V with power factor 0.6. Apparent power is 200 × 10 = 2,000 VA. Active power is 2,000 × 0.6 = 1,200 W. Reactive power is √(2,000² − 1,200²) = 1,600 var. If this load runs for four hours, energy is 1.2 kW × 4 h = 4.8 kWh. Read each question carefully: it may ask for active power in watts, apparent power in volt-amperes, or energy in kilowatt-hours. Power factor is not a measure of efficiency; it is the cosine of the phase angle between voltage and current.

Control and sequence diagrams

Trace the coil circuit from supply through every stop, overload, and interlock contact; parallel paths hold, series contacts stop.

In a self-holding circuit, a normally open start button is wired in parallel with a normally open auxiliary contact of the contactor. The stop button and any normally closed overload contact are in series with the coil. Pressing start energizes the coil, the auxiliary contact closes, and the coil remains energized after the start button is released. Pressing stop, or opening the overload contact, breaks the series path. The coil drops, the holding contact reopens, and a new start operation is required after the fault is reset.

For an interlock, place a normally closed auxiliary contact of contactor F in series with the coil of contactor R, and a normally closed auxiliary contact of R in series with the coil of F. Then F cannot be energized while R is held in, and vice versa. Trace the actual coil path rather than judging by the labels alone. Check whether each contact is drawn in its unoperated state, whether the holding contact is parallel to the start button, and whether the overload contact is in the coil circuit. A circuit that looks plausible can still fail if a normally closed contact is used where a normally open contact is required.

Inspection and measurement reasoning

Choose the instrument for the quantity, confirm isolation where required, and interpret the pattern rather than one number.

An insulation resistance tester is used for insulation resistance on an isolated circuit; a low-voltage multimeter is not a substitute. A clamp meter measures current through the magnetic field around a single conductor. If it is clamped around both line and neutral of a single-phase circuit, the opposing currents tend to cancel and the reading is near zero. A continuity test checks whether a low-resistance path exists. An earth tester measures earth electrode resistance. Select the instrument and range before connecting leads, prove the tester where appropriate, and isolate or discharge equipment according to the task and applicable procedure.

Scenario: three isolated final circuits read 0.2 MΩ, 20 MΩ, and 100 MΩ. The 0.2 MΩ result is the outlier and should be investigated while the circuit remains isolated. Look for moisture, damage, contamination, or a connection problem, then retest. Do not declare a pass or fail without the applicable criteria, and do not energize a suspect circuit to dry it out. A high insulation reading also does not prove that every terminal is correctly connected, so visual inspection and continuity checks remain necessary. In practical work, loose strands, wrong terminals, missing grounding, and damaged sheath are defects even if the circuit appears to function.

Safety and protective judgment

De-energize and verify before work; coordinate load, conductor, and protection; never improvise around a protective device.

A safe conceptual sequence is: plan the task, identify all sources, isolate, lock or tag as required, prove the voltage tester, verify de-energization, and prove the tester again (for example, on a known live source where available) before work; then restore in a controlled way. Insulated tools and appropriate personal protective equipment are used when the risk assessment requires them, especially for live-adjacent work, but gloves alone are not a substitute for isolation. Red flags include exposed live parts, water near equipment, burning smells, repeatedly blowing protective devices, and damaged cords. Stop and escalate rather than working around the hazard.

Protective judgment means coordinating the load, conductor capacity, protective-device rating, installation method, and earthing or bonding. Replacing a fuse or breaker with a larger rating to stop nuisance blowing is poor practice because the protective device may no longer protect the conductor. For an added load, check the existing circuit design before acceptance. Exact legal values and installation rules must come from the current applicable standards and official guidance; this guide teaches the reasoning principle, not a substitute rulebook.

Common errors to eliminate

Most lost marks come from predictable slips, not from lack of theory.

Theory errors include adding parallel resistances directly, using peak voltage where RMS is required, omitting power factor, and mixing mA with A or W with kW. Diagram errors include confusing normally open and normally closed contacts, omitting the overload contact, placing the holding contact in series with the start button instead of in parallel, and forgetting an interlock. Measurement errors include using a multimeter for insulation resistance, testing without confirming isolation, failing to prove the tester, and treating one odd reading as conclusive.

Practical errors include misreading the diagram, stripping or cutting conductors incorrectly, leaving loose strands, using the wrong terminal, omitting grounding, and rushing without a continuity check. Safety errors include assuming a circuit is dead because a switch is off, failing to lock or tag, using damaged tools, and relying on PPE instead of engineering controls. Build a short checklist for each domain and use it after every practice attempt. The checklist should force you to state the quantity being measured, the instrument selected, the expected result, and the action to take if the result is abnormal.

Integrated practice task and self-check

Use one open task that joins diagram reading, calculation, measurement choice, and defect reasoning.

Open-task practice: take a simple control diagram containing a start button, stop button, overload contact, contactor coil, holding contact, and indicator lamp, plus a final circuit with a stated load. Produce a terminal-to-terminal connection schedule. Calculate the branch current, total active power, and energy for a stated number of hours. Select conceptually appropriate instruments for continuity, insulation resistance, earth resistance, and current. List pre-energization checks and three likely defects. Write the safe isolation sequence you would expect before any work. If you have no supervised workshop, redraw the diagram and narrate the connections; do not attempt unsupervised wiring or live testing.

Self-check rubric, 20 points: calculations correct with units, 4; diagram logic including normally open, normally closed, self-holding and interlock, 4; instrument and isolation choices, 3; defect identification and safety red flags, 4; complete labeled connection schedule and sequence, 3; self-check catches inconsistencies, 2. A score below 16 means revisit the weakest domain before a timed rehearsal. A score of 16 to 18 means repeat the task with a different diagram. A score of 19 or 20 means move to mixed questions and supervised practical rehearsal. The multiple-choice preview is not a practical simulation and does not replace a defect-based build.

Practical study sequence

Build fluency in layers, then rehearse mixed and open tasks under realistic constraints.

A four-week conceptual plan: week 1, daily calculation practice and unit checks; week 2, ladder and sequence diagrams, including self-holding and interlocks; week 3, inspection, measurement selection, and safety judgment; week 4, mixed timed sets and the open task above. A 40-minute session can be split into 10 minutes of recall, 20 minutes of worked problems, and 10 minutes of error-log review. Do not memorize administrative dates, fees, or exemption details from a preview; use the current official candidate guide for those.

For the practical component, practise only under supervision with the materials and tools permitted in that setting. Use a material check when instructed, time checkpoints, a connection schedule, and a final defect checklist. If workshop access is unavailable, draw diagrams, write terminal schedules, and explain the operation of each contact; do not claim hands-on competence from paper practice. Finish preparation by taking the 20 questions timed, then explain every wrong answer and one right answer aloud to confirm that your reasoning, not just your memory, is correct.

References and further reading

Use these references to explore the concepts and check the latest information from the relevant organizations.

Continue your preparation

FAQ

Frequently Asked Questions

Practical answers to help you apply the guidance for Type 2 Electrician 第二種電気工事士 (Written + Practical).

Do these 20 multiple-choice questions simulate the practical examination?
No. They check supporting knowledge such as calculations, contact logic, instrument choice, and safety reasoning. The practical examination is a timed build from a wiring diagram using materials provided at the test site, judged for defects. Use the open task and supervised practice for practical preparation.
What are the stated pass standards for the written and practical tests?
Official materials state a written pass mark of 60 and a practical standard of no defects. Treat these as the stated standards for the examination described here, not as a guarantee. Check the current official guide for administrative details, eligibility, exemptions, dates, fees, and any updates.
Which calculations should I be able to do quickly?
Prioritize Ohm's law, series and parallel equivalent resistance, voltage and current division, single-phase power, power factor, energy in kWh, and RMS from a sine-wave peak. Also practise unit conversion and sanity checks, such as verifying that branch currents sum to the total current.
How should I read a ladder diagram under time pressure?
Start at the supply and trace the coil circuit. Mark every series contact that can stop the coil, then identify parallel paths that can hold it. Check the unoperated state of each contact and look for interlocks. Trace operation step by step: start pressed, coil energized, holding contact closed, stop or overload opened, coil released.
What should I do if one insulation resistance reading is much lower than the others?
Keep the suspect circuit isolated and treat the reading as an outlier to investigate. Check for moisture, damage, contamination, and connection problems, then retest according to the applicable procedure and criteria. Do not energize the circuit to dry it out, and do not declare a pass or fail from a single number without the relevant standard.

Keep Reading

Related Study Guides

Explore related guides and preparation topics.

Study Guide

Type 1 Electrician 第一種電気工事士 (Written + Practical)

Original practice preview for the Type 1 Electrician (第一種電気工事士) written-examination scope, covering Electrical Theory and Circuits, Equipment Wiring and Diagrams, Installation Inspection and Measurement, and Regulations Safety and Practical Judgment. This module is a theory and decision-making preview only: the actual credential includes a practical skills assessment, and these original questions and flashcards do not replace required hands-on preparation, official study materials, or the practical work itself. All questions are original practice items based on stable electrical principles and are not official examination content.

Read guide
Study Guide

1st Class Electrical Construction Management Engineer 一級電気工事施工管理技士

Free theory-preview practice set for the 1st Class Electrical Construction Management Engineer (一級電気工事施工管理技士) examination. This credential, governed by Japan's Ministry of Land, Infrastructure, Transport and Tourism (MLIT), assesses planning, quality, safety, schedule control, construction methods, and applicable regulations for electrical construction work. This preview contains original practice questions and flashcards covering stable technical principles and applied calculations. It is a theory-only preview: it does not reproduce secure exam content, does not state official pass marks, item counts, fees, or dates, and does not claim these items are official questions. For this practical qualification, the real examination includes subject-specific practical assessment that cannot be simulated here; this resource prepares foundational knowledge only.

Read guide
Study Guide

Second-Class Electric Chief Engineer 電験二種 (Primary + Secondary)

Free practice preview for the Second-Class Electric Chief Engineer (電験二種) covering both the primary (theory) and secondary (theory) examinations at a theory-preview level only. This qualification is administered in Japan, and the official examination center provides authoritative administration information; no official past questions are reproduced here. All 20 questions and 20 flashcards are original study items built on stable electrical engineering principles across Electrical Theory, Power Systems, Electrical Machinery and Applications, and Law Safety and System Management. This preview does not reproduce secure exam content and makes no claims about current item counts, pass marks, fees, or schedules.

Read guide